@ -4,6 +4,19 @@ This document is your complete step-by-step guide on how to manually verify and
|
|||||||
|
|
||||||
---
|
---
|
||||||
|
|
||||||
|
## 0. Initial Settings Configuration (For a Fresh Database)
|
||||||
|
If you are deploying this on a brand-new database, you **must manually turn on** these advanced Odoo features before verifying the rest of the steps.
|
||||||
|
|
||||||
|
**Turn on Inventory Features:**
|
||||||
|
1. Open the **Inventory app**.
|
||||||
|
2. Go to **Configuration > Settings**.
|
||||||
|
3. Scroll to the **Products** section and turn ON **Units of Measure**.
|
||||||
|
4. Scroll to the **Traceability** section and turn ON **Lots & Serial Numbers**.
|
||||||
|
5. Once "Lots" is on, check the new box for **Expiration Dates** that appears right below it.
|
||||||
|
6. Click the purple **Save** button at the top left.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
## 1. How to Check: Multi-Company Architecture
|
## 1. How to Check: Multi-Company Architecture
|
||||||
**Goal**: Verify that all 3 companies and their isolated warehouses exist.
|
**Goal**: Verify that all 3 companies and their isolated warehouses exist.
|
||||||
|
|
||||||
|
|||||||
161
weektwo.md
Normal file
161
weektwo.md
Normal file
@ -0,0 +1,161 @@
|
|||||||
|
# Week 2 Implementation Guide: Manufacturing (MRP) + Multi-Output BOM + Yield/Wastage
|
||||||
|
|
||||||
|
This guide explains what Odoo Community Edition already provides, what we built custom, and how to verify each feature.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Odoo Community vs Custom — What You Get
|
||||||
|
|
||||||
|
| Feature | Odoo Community | C2C Custom |
|
||||||
|
|---|---|---|
|
||||||
|
| Work Centers (Cleaning, Grading, Packing) | ✅ Built-in | — |
|
||||||
|
| Standard BOM + Single Finished Product | ✅ Built-in | — |
|
||||||
|
| Operations/Routing on Work Centers | ✅ Built-in | — |
|
||||||
|
| Byproducts on BOM | ✅ Built-in (1 extra output) | — |
|
||||||
|
| Standard Costing + Labor on Work Centers | ✅ Built-in | — |
|
||||||
|
| Scrap during MO | ✅ Built-in | — |
|
||||||
|
| **Multiple Finished Products per BOM** | ❌ Not supported | ✅ `c2c_multi_output_bom` |
|
||||||
|
| **Stock moves per output on MO completion** | ❌ Not supported | ✅ `c2c_multi_output_bom` |
|
||||||
|
| **Yield % / Wastage report per batch/lot** | ❌ Not supported | ✅ `c2c_yield_wastage` |
|
||||||
|
| **Auto-generate yield record on MO done** | ❌ Not supported | ✅ `c2c_yield_wastage` |
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Step 0 — Initial Settings Configuration (For a Fresh Database)
|
||||||
|
If you are deploying this on a brand-new database, you **must manually turn on** these advanced Odoo features before the custom features will appear.
|
||||||
|
|
||||||
|
**Turn on Manufacturing Features:**
|
||||||
|
1. Open the **Manufacturing app**.
|
||||||
|
2. Go to **Configuration > Settings**.
|
||||||
|
3. Under the **Operations** section, check the box for **Work Orders**.
|
||||||
|
4. Click the purple **Save** button at the top left.
|
||||||
|
*(Note: If you do not do this, the "Work Centers" menu will remain completely hidden!)*
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Step 2.1 — Standard MRP Configuration
|
||||||
|
|
||||||
|
### (Step 2.1.1) Create Work Centers
|
||||||
|
1. Open **Manufacturing** app > **Configuration** > **Work Centers**.
|
||||||
|
2. Click **New** and create the following 4 work centers for C2C Agricorp:
|
||||||
|
|
||||||
|
| Work Center | Company | Cost per Hour |
|
||||||
|
|---|---|---|
|
||||||
|
| Cleaning Station | C2C Agricorp India Pvt Ltd | ₹150 |
|
||||||
|
| Grading Table | C2C Agricorp India Pvt Ltd | ₹200 |
|
||||||
|
| Packing Line | C2C Agricorp India Pvt Ltd | ₹250 |
|
||||||
|
| Stringing Station | C2C Agricorp India Pvt Ltd | ₹180 |
|
||||||
|
|
||||||
|
3. On each Work Center form, set the **Costing Method** to `Time-based` and set the **Cost per Hour**.
|
||||||
|
|
||||||
|
|
||||||
|
### (Step 2.1.3) Set Standard Cost on Raw Materials
|
||||||
|
1. Open **Inventory** > **Products** > **Products**.
|
||||||
|
2. Open **Raw Turmeric** (or your flower product).
|
||||||
|
3. Under the **Purchase** tab, verify the cost.
|
||||||
|
4. Under **General Information** > **Product Type**: set to `Storable Product`.
|
||||||
|
5. Go to **Accounting** tab > **Costing Method**: should read `Standard Price`.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Step 2.2 — Multi-Output BOM (`c2c_multi_output_bom`)
|
||||||
|
|
||||||
|
This custom module allows a single BOM to produce **multiple finished products** in one Manufacturing Order.
|
||||||
|
|
||||||
|
### How to create a Multi-Output BOM (Example: Roses)
|
||||||
|
1. Open **Manufacturing** > **Products** > **Bills of Materials**.
|
||||||
|
2. Click **New**.
|
||||||
|
3. Set:
|
||||||
|
- **Product**: `Pack 500g Roses` (your primary/main output)
|
||||||
|
- **Quantity**: `200`
|
||||||
|
- **BOM Type**: `Manufacture This Product`
|
||||||
|
4. In the **Components** tab, add: `Raw Roses | 100 kg`.
|
||||||
|
5. Click the **Output Products** tab (new custom tab).
|
||||||
|
6. Click **Add a line** and add co-products:
|
||||||
|
|
||||||
|
| Output Product | Quantity | Notes |
|
||||||
|
|---|---|---|
|
||||||
|
| Pack 500g Roses (Stems) | 5 | Byproduct stems |
|
||||||
|
|
||||||
|
7. **Save** the BOM.
|
||||||
|
|
||||||
|
### How to run a Multi-Output Manufacturing Order
|
||||||
|
1. Go to **Manufacturing** > **Manufacturing Orders** > **New**.
|
||||||
|
2. Select the **BOM** you just created. The **Additional Outputs** tab will appear automatically with your co-products pre-filled.
|
||||||
|
3. Set the **Actual Qty** for each output on the **Additional Outputs** tab.
|
||||||
|
4. Assign **Lot/Batch** to each output line (for FEFO traceability).
|
||||||
|
5. Click **Mark as Done**.
|
||||||
|
6. ✅ Odoo will automatically create separate stock moves for EACH output product into your finished goods location.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Step 2.3 — Yield & Wastage (`c2c_yield_wastage`)
|
||||||
|
|
||||||
|
This module auto-generates a yield report every time a Manufacturing Order is marked as Done.
|
||||||
|
|
||||||
|
### How Yield is Calculated
|
||||||
|
```
|
||||||
|
Input Qty = Total raw materials consumed
|
||||||
|
Output Qty = Finished goods produced (what went to stock)
|
||||||
|
Wastage = Input - Output
|
||||||
|
Yield % = (Output / Input) × 100
|
||||||
|
```
|
||||||
|
|
||||||
|
### How to View Yield Reports
|
||||||
|
1. Go to **Manufacturing** > **Reporting** > **Yield & Wastage** (new menu).
|
||||||
|
2. You will see a list of all completed MOs with their yield data.
|
||||||
|
3. **Colour coding**:
|
||||||
|
- 🔴 Red = Yield below 70% (critical — investigate)
|
||||||
|
- 🟡 Yellow = Yield below 85% (warning — review process)
|
||||||
|
- ✅ White = Yield 85% and above (acceptable)
|
||||||
|
4. Click any record to open the form view with full detail, lot traceability, and a **Notes** field to record root cause.
|
||||||
|
|
||||||
|
### Smart Button on MO
|
||||||
|
After marking an MO as Done, go back to the Manufacturing Order. A new **Yield Reports** smart button (bar chart icon) will appear in the top right of the MO form. Click it to jump directly to the yield data for that batch.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Step 2.4 — Manufacturing Cost Rollup
|
||||||
|
|
||||||
|
### How to include labor/overhead in finished goods cost
|
||||||
|
1. Open **Manufacturing** > **Configuration** > **Work Centers**.
|
||||||
|
2. Open each work center. Set the **Cost per Hour** (labor rate).
|
||||||
|
3. On the BOM, under the **Operations** tab, add:
|
||||||
|
- Work Center: `Grading Table`
|
||||||
|
- Duration: `30 minutes`
|
||||||
|
4. When the MO is completed, Odoo's `mrp_account` module (already installed) will post:
|
||||||
|
- **Raw material cost** → Debit Work In Progress
|
||||||
|
- **Labor cost** (time × rate) → Debit Work In Progress
|
||||||
|
- On MO done: WIP transfers to Finished Goods at the rolled-up total cost.
|
||||||
|
|
||||||
|
### Verify Cost Rollup
|
||||||
|
1. Complete an MO for `Pack 500g Roses`.
|
||||||
|
2. Go to the MO form > Click the **Valuation** smart button (if visible, requires Inventory Valuation enabled).
|
||||||
|
3. Also check: **Accounting** > **Journal Entries** and filter by `Manufacturing`.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Verification Checklist — Week 2
|
||||||
|
|
||||||
|
- [ ] **Work Centers** created (Cleaning, Grading, Packing, Stringing)
|
||||||
|
- [ ] **Multi-Output BOM** created with Output Products tab visible
|
||||||
|
- [ ] **MO completes multi-output** → verify 2+ stock moves created in Inventory > Transfers
|
||||||
|
- [ ] **Yield report** auto-generated after MO completion
|
||||||
|
- [ ] **Yield & Wastage report** visible in Manufacturing > Reporting
|
||||||
|
- [ ] **Color coding** works — try an MO where output < 70% of input
|
||||||
|
- [ ] **Journal entries** posted for raw cost + labor cost on MO completion
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Example: Jasmine Stringing Flow
|
||||||
|
|
||||||
|
**BOM Setup:**
|
||||||
|
- Primary Output: `Bundle (3m) Jasmine` — Qty: 20
|
||||||
|
- Component: `Raw Jasmine` — 100 kg
|
||||||
|
- Output Products tab: *(none — single output, standard flow)*
|
||||||
|
- Operations: `Stringing Station | 2 hours`
|
||||||
|
|
||||||
|
**Expected Results after MO Done:**
|
||||||
|
- 20 x Bundle (3m) Jasmine moved to Finished Goods ✅
|
||||||
|
- Yield Report created: Input 100kg, Output ~60kg equivalent, Yield ~60% ✅
|
||||||
|
- Journal Entry: Raw Material Cost + (2hr × ₹180) = Total COGS ✅
|
||||||