Garment_ERP/WORKFLOW_GUIDELINE.md
2026-09-21 16:43:23 +05:30

428 lines
24 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Tiruppur Garment Manufacturing ERP — Complete Step-by-Step Workflow Guide
**Odoo 19 Community / Enterprise Edition**
*Industrial Apparel & Knitwear ERP Suite for Tiruppur Garment Manufacturers*
---
## Table of Contents
1. [End-to-End Workflow Architecture](#1-end-to-end-workflow-architecture)
2. [Phase 1: Base Masters & Factory Foundation](#phase-1-base-masters--factory-foundation)
3. [Phase 2: Style Master, POM Grading & Tech Pack](#phase-2-style-master-pom-grading--tech-pack)
4. [Phase 3: Garment Pre-Costing & Target Margin](#phase-3-garment-pre-costing--target-margin)
5. [Phase 4: Sales Orders & 2D Color × Size Order Matrix](#phase-4-sales-orders--2d-color--size-order-matrix)
6. [Phase 5: Garment Bill of Materials (BOM) & Routing](#phase-5-garment-bill-of-materials-bom--routing)
7. [Phase 6: Master Production Planning (PP)](#phase-6-master-production-planning-pp)
8. [Phase 7: Material Requirement Planning (MRP) & Purchase RFQs](#phase-7-material-requirement-planning-mrp--purchase-rfqs)
9. [Phase 8: Fabric Roll Inventory & 4-Point Quality Inspection](#phase-8-fabric-roll-inventory--4-point-quality-inspection)
10. [Phase 9: Cutting Room Lay Planning & Marker Ratio](#phase-9-cutting-room-lay-planning--marker-ratio)
11. [Phase 10: Barcode Bundle Generation & Traveler Tracking](#phase-10-barcode-bundle-generation--traveler-tracking)
12. [Phase 11: Sewing Floor & Real-Time Hourly Efficiency Logging](#phase-11-sewing-floor--real-time-hourly-efficiency-logging)
13. [Phase 12: Subcontracting & Job Work (Delivery Challans)](#phase-12-subcontracting--job-work-delivery-challans)
14. [Phase 13: Multi-Stage Quality Control (QC) & Rework Routing](#phase-13-multi-stage-quality-control-qc--rework-routing)
15. [Phase 14: Master Carton Packing, Finished Goods (FG) & Dispatch](#phase-14-master-carton-packing-finished-goods-fg--dispatch)
16. [Control Room: Factory Dashboard & Traceability Explorer](#control-room-factory-dashboard--traceability-explorer)
17. [Index of Standard Print Reports & Barcode Tickets](#index-of-standard-print-reports--barcode-tickets)
---
## 1. End-to-End Workflow Architecture
```mermaid
flowchart TD
M1[1. Base Masters: Colors, Sizes, Fabrics, Lines] --> S1[2. Garment Style & Tech Pack]
S1 --> C1[3. Pre-Costing Sheet]
S1 --> SO[4. Sales Order & 2D Matrix Grid]
SO --> PP[5. Production Master Plan]
PP --> BOM[6. Garment BOM & SAM Routing]
PP --> MRP[7. MRP & Shortage Purchase RFQ]
MRP --> FR[8. Fabric Roll Inward & 4-Point QC]
FR --> CP[9. Cutting Plan & Lay Ratio]
CP --> BND[10. Barcoded Bundle Tickets]
BND --> SEW[11. Sewing Line & Hourly Efficiency]
BND -.-> JW[12. Job Work Subcontracting: Dyeing/Print/Embroidery]
SEW --> QC[13. Endline QC & Rework Routing]
QC --> RW[13b. Rework Order & Repair]
RW --> QC
QC --> PCK[14. Export Carton Packing]
PCK --> FG[15. Finished Goods Inventory]
FG --> DSP[16. Dispatch & Shipping Logistics]
```
---
## Phase 1: Base Masters & Factory Foundation
Configure these fundamental building blocks before entering transactions:
* **Menu Path**: `Garment ERP > Configuration`
| Master Name | Technical Model | Purpose & Required Settings |
| :--- | :--- | :--- |
| **Garment Colors** | `garment.color` | Name, unique color code, color family group, Pantone reference (TPX/TCX), and Hex swatch code (e.g., `#000000` for Black, `#1E3A8A` for Navy). |
| **Garment Sizes** | `garment.size` | Size code (e.g., `XS`, `S`, `M`, `L`, `XL`, `2XL`), size category (Adult, Youth, Infant), and display sequence (controls column ordering in the 2D matrix). |
| **Fabric Knit Types** | `garment.fabric.type` | Knit structures (Single Jersey, 1x1 Rib, 2x2 Rib, Interlock, Pique Polo, Fleece, French Terry, Waffle) with target GSM ranges. |
| **Compositions** | `garment.composition` | Yarn composition percentages (e.g., 100% Cotton, 60/40 CVC, 95/5 Cotton Lycra). |
| **Brands & Seasons** | `garment.brand`, `garment.season` | Brand identities, logos, and seasonal milestones (e.g., `SS-2026`, `AW-2026`). |
| **Garment Types** | `garment.type` | Top wear, Bottom wear, Outerwear, Activewear, Innerwear. |
| **Defect Types** | `garment.defect.type` | Under `Quality & Rework > Defect Categories Master`. Stitching, Fabric, Measurement, Print/Embroidery, and Finishing defects with severity levels (Minor, Major, Critical). |
| **Sewing Lines** | `garment.sewing.line` | Under `Sewing Floor > Sewing Lines Configuration`. Line code, supervisor, operator count, helper count, daily target capacity. |
---
## Phase 2: Style Master, POM Grading & Tech Pack
The Style Master represents the garment's design, Point of Measurement (POM) grading chart, and SKU generator.
* **Menu Path**: `Garment ERP > Merchandising > Garment Styles`
### Step-by-Step Procedure:
1. Click **New** and enter:
* **Style Code**: Internal style code (e.g., `TSH-1001`).
* **Style Description**: Full commercial title (e.g., *Men's Crew Neck Bio-Washed T-Shirt*).
* **Classification**: Select Brand, Season, Gender, Garment Type, and Buyer.
* **Tiruppur Fabric Specs**:
* **Knit Structure**: e.g., Single Jersey.
* **Fabric Composition**: e.g., 100% Combed Cotton.
* **Fabric GSM**: e.g., `180` g/m².
* **Fabric Width**: e.g., `30.0` inches.
* **Width Type**: Select `Tubular / Dia` (Circular Knit) or `Open Width` (Slit & Stentered).
* **Shrinkage %**: Enter Length & Width expected shrinkage (default 4.0%).
* **Yarn Count**: e.g., `30s Combed`.
* **Industrial Engineering (IE)**:
* **Sewing SAM**: Standard Allowed Minutes (e.g., `12.0` min).
* **Total SMV**: Total Standard Minute Value including cutting and finishing (e.g., `18.0` min).
* **Colors & Sizes**: Pick all active colors and sizes for this style.
* **Media & Tech Pack**: Upload front/back sketch photos and attach the buyer's Tech Pack PDF.
* **Point of Measurement (POM) Specifications**:
* Add measurement lines: Chest Width, Body Length, Across Shoulder, Sleeve Length, Neck Drop, Bottom Hem, etc.
* Define `Tol (+)` and `Tol (-)` tolerances.
* Enter graded measurements across XS, S, M, L, XL, XXL, 3XL in cm or inches.
2. Click **Generate Product Variants** (Header button):
* Automatically generates standard Odoo `product.product` records with the SKU structure `[STYLE]-[COLOR]-[SIZE]` (e.g., `TSH-1001-BLK-M`).
* Product variants are immediately available for inventory tracking and BOM linking.
---
## Phase 3: Garment Pre-Costing & Target Margin
Calculate cost per piece, cost per dozen, overheads, and target profit margins.
* **Menu Path**: `Garment ERP > Merchandising > Garment Pre & Post Costing`
### Step-by-Step Procedure:
1. Click **New**, select the **Garment Style**, **Buyer**, and enter **Target Order Quantity** (e.g., `10,000` Pcs).
2. Set **Costing Stage**: Select `Pre-Costing (Quotation / Estimate)`.
3. If an approved BOM exists, click **Load from BOM** to pull fabric, trim, and labor costs automatically; otherwise enter:
* **Raw Materials**: Fabric cost / pc + Dyeing & Finishing cost / pc.
* **Trims & Accessories**: Labels, tags, polybags, cartons, threads.
* **Value Addition**: Chest print / Rotary print / Embroidery / Bio-washing.
* **Manufacturing CM (Cut & Make)**: Cutting labor / pc + Sewing CM labor / pc.
* **Packaging & Freight**: Polybags & Cartons / pc + Local freight & Port handling / pc.
* **Factory Overheads %**: e.g., `8.0%`.
4. Review the auto-computed metrics:
* **Total Garment Cost / Pc**
* **Total Garment Cost / Dozen**
* **Total Order Cost**
5. Enter **Target Selling Price / Pc** (e.g., `₹180.00`).
6. Inspect the auto-computed **Gross Margin / Pc**, **Gross Margin %**, and **Total Expected Profit**.
---
## Phase 4: Sales Orders & 2D Color × Size Order Matrix
Handle customer orders with multi-dimensional Color × Size distribution.
* **Menu Path**: `Garment ERP > Merchandising > Garment Sales Orders`
### Step-by-Step Procedure:
1. Click **New**, pick the **Buyer / Customer**, and ensure **Garment Manufacturing Order** is checked.
2. Select the **Garment Style** (this auto-fills Season, Customer Style Ref, and Buyer).
3. Set **Buyer PO Reference**, **Target Shipment Date**, **Ex-Factory Date**, and **Shipment Mode** (Sea, Air, Road).
4. Navigate to the **Size-Color Order Matrix** tab:
* Add lines selecting Color, Size, Quantity, and Unit Price.
* The live **HTML Order Matrix Summary** renders the full 2D Color vs Size table with color swatches, row subtotals, column subtotals, and total piece count.
5. Click **Sync Matrix to Order Lines** (Header button):
* Creates or updates native Odoo `sale.order.line` records linked to the specific variant SKUs (`product.product`).
6. Click **Confirm** to lock the Sales Order.
---
## Phase 5: Garment Bill of Materials (BOM) & Routing
Define raw material consumption and process routing per garment unit.
* **Menu Path**: `Garment ERP > Planning & MRP > Garment BOMs`
### Step-by-Step Procedure:
1. Click **New**, choose the **Garment Style**, and keep **Base Quantity** as `1.0 Pc`.
2. **Fabric Components Tab**:
* Add components: Body Panels (Front & Back), Neck Rib, Flat Collar, Pocket Panels, Sleeve Cuffs, Plackets, Hoods.
* Specify **Fabric Product**, **Net Consumption (Kg/Pc)** (e.g., `0.1800 Kg`), **Cutting Wastage %** (e.g., `5.0%`), and **Fabric Cost / Kg**.
* The system computes **Gross Consumption (Kg/Pc)** and **Fabric Cost / Pc**.
3. **Trims & Accessories Tab**:
* Add trims: Main Label, Size Label, Wash Care Label, Hang Tag, Price Tag, Polybag, Master Carton Box, Sewing Thread, Buttons, Zippers.
* Specify **Net Qty / Pc**, **Allowance %** (e.g., `3%`), and **Unit Cost**.
4. **Operations & Routing Tab**:
* Add manufacturing operations in sequential order across Cutting, Sewing, Job Work, Washing, Finishing, and Packing.
* Assign machine types (SNLS, 4T Overlock, 5T Overlock, Flatlock, Button Stitch, Steam Iron) with operation SAM and labor minute rate.
5. Save the BOM. The system calculates estimated garment production cost per piece.
---
## Phase 6: Master Production Planning (PP)
Master Production Planning links customer demand, floor scheduling, and shop floor execution.
* **Menu Path**: `Garment ERP > Planning & MRP > Production Plans`
*(Or click "Create Production Plan" inside the confirmed Sales Order)*
### Step-by-Step Procedure:
1. In the Production Plan, verify:
* **Sales Order Ref**, **Garment Style**, and **Garment BOM**.
* **Planned Quantity**, **Production Start Date**, **Target Delivery Date**, and **Priority**.
* The **Color/Size Production Targets** table auto-populates all matrix lines from the sales order.
2. Click **Confirm Plan** $\rightarrow$ Status changes to `Planned / Scheduled`.
3. Click **Start Production** $\rightarrow$ Status changes to `In Production`.
4. Smart buttons track progress in real time:
* **Cutting Orders**
* **Bundles**
* **Job Work Orders**
* **QC Inspections**
* **Packing Plans**
5. Progress bar and stage quantities (**Cut Qty**, **Sewn Qty**, **Packed Qty**, **Dispatched Qty**) update automatically from shop floor execution.
---
## Phase 7: Material Requirement Planning (MRP) & Purchase RFQs
Calculate gross material requirements, compare against on-hand stock, and generate purchase orders for shortages.
* **Menu Path**: Inside the Production Plan, click **Calculate Material Requirements (MRP)**
*(Or go to `Garment ERP > Planning & MRP > Material Requirements (MRP)`)*
### Step-by-Step Procedure:
1. Open the MRP record and click **Compute Material Requirements**:
* Multiplies planned garment pieces by BOM gross fabric consumption (Kg) and trim quantities.
* Compares required quantities against warehouse stock on hand (`qty_available`).
* Determines net **Shortage Quantity** and total procurement cost.
2. Click **Generate Purchase RFQs**:
* Automatically creates draft Purchase Orders (`purchase.order`) for all shortage materials grouped by vendor.
* Links generated RFQs directly to the MRP record for traceability.
---
## Phase 8: Fabric Roll Inventory & 4-Point Quality Inspection
Track knitted fabric roll inventory and enforce the international 4-point defect grading system before cutting.
* **Menu Path**: `Garment ERP > Fabric & Stores > Fabric Rolls`
### Step-by-Step Procedure:
1. **Inward Fabric Rolls**:
* Click **New** and record Roll Number, Fabric Product, Shade/Dyeing Lot #, Actual GSM, Width, Width Type (Tubular/Open Width), Gross Weight (Kg), Tare Weight (Kg), and Fabric Mill Supplier.
* Initial status is `Received / Uninspected`.
2. **Conduct 4-Point Inspection**:
* Click **Create 4-Point Inspection** (or go to `Fabric 4-Point Inspections`).
* Inspector verifies measured GSM, measured Width, and evaluates **Shade Grade** (`Grade A` to `Grade D`).
* Enter defect counts found across the inspected length based on standard 4-point defect rules:
* **1 Point**: Defect $\le$ 3 inches.
* **2 Points**: Defect > 3 up to 6 inches.
* **3 Points**: Defect > 6 up to 9 inches.
* **4 Points**: Defect > 9 inches or any hole.
* The system computes the defect score:
$$\text{Score per 100 } \text{m}^2 = \frac{\text{Total Defect Points} \times 100}{\text{Inspected Length (Meters)} \times \text{Fabric Width (Meters)}}$$
* **Pass/Fail Decision**:
* If $\text{Score} \le \text{Threshold (default 28 points)}$: Click **Quality Passed** $\rightarrow$ Roll status becomes **Quality Approved (Ready to Cut)**.
* If score exceeds threshold: Click **Quality Failed** $\rightarrow$ Roll status becomes **Quality Rejected (Quarantine)**.
* *Only Quality Approved rolls can be issued to cutting orders.*
---
## Phase 9: Cutting Room Lay Planning & Marker Ratio
Plan marker dimensions, fabric roll allocation, and cutting ratios.
* **Menu Path**: Inside the Production Plan, click **Create Cutting Order**
*(Or go to `Garment ERP > Cutting & Bundling > Cutting Orders`)*
### Step-by-Step Procedure:
1. On the Cutting Plan form:
* Select **Body Fabric Color**.
* Enter **Marker Length (Meters)**, **Marker Width (Inches)**, **Number of Plies / Layers** (e.g., `100`), and **Bundle Size** (default `25` pieces/bundle).
* Review the **Size Cut Ratio** lines (auto-populated from the production targets, e.g., S:1, M:2, L:2, XL:1).
* **Planned Cut Pieces** is computed: $\text{Plies Count} \times \sum(\text{Ratios})$.
2. **Fabric Roll Allocation Tab**:
* Select approved fabric rolls (`garment.fabric.roll`).
* Enter **Weight Issued (Kg)**, **Weight Consumed (Kg)**, and **End-Bit Scrap (Kg)**.
* The system computes **Fabric Wastage %** and deducts consumed weight from the fabric rolls.
3. Click **Start Cutting** $\rightarrow$ Status changes to `In Cutting`.
---
## Phase 10: Barcode Bundle Generation & Traveler Tracking
Split cut plies into serialized bundle travelers with barcode tickets.
* **Menu Path**: Inside the Cutting Plan, click **Generate Production Bundles**
### Step-by-Step Procedure:
1. Clicking **Generate Production Bundles**:
* Divides cut pieces into bundles conforming to the configured **Bundle Size** (e.g., 25 pcs).
* Creates serialized bundle records (`BND-XXXXX`) with ply ranges (e.g., Ply 125, Ply 2650) and unique barcodes.
* Sets Cutting Plan status to `Cut & Bundled`.
2. **Print Bundle Barcode Tickets**:
* Open the **Generated Bundles** smart button, select all bundles, and click **Print > Production Bundle Barcode Tickets**.
* Attach printed tickets to the cut bundles as physical travelers.
3. **Shop Floor Traveler Workflow**:
* As bundles move through manufacturing cells, operators scan or click:
* **Send to Sewing** $\rightarrow$ Stage: `Sewing Assembly`
* **Send to Job Work** $\rightarrow$ Stage: `External Processing`
* **Move to Quality** $\rightarrow$ Stage: `Quality Inspection`
* **Move to Packing** $\rightarrow$ Stage: `Packing Section`
* **Complete Packing** $\rightarrow$ Stage: `Finished Goods / Packed`
* Every movement creates an immutable entry in the bundle's **Operation Tracking History** table.
---
## Phase 11: Sewing Floor & Real-Time Hourly Efficiency Logging
Track hourly line outputs, defect counts, and operator efficiency.
* **Menu Path**: `Garment ERP > Sewing Floor > Hourly Production Logs`
### Step-by-Step Procedure:
1. Click **New** at the start of each production shift:
* Select **Sewing Line**, **Date**, **Shift**, **Garment Style Running**, and **Production Order**.
* Operators present and Style SAM auto-populate from the line and style masters.
2. Record output and defects at the end of each hour:
* Enter **Target**, **Actual Output**, and **Defect / Alteration Count** for hours H1 through H8 (+ OT).
3. Review Live Line Performance:
* The system computes day totals and line efficiency:
$$\text{Line Efficiency \%} = \frac{\text{Total Day Actual Output} \times \text{SAM}}{\text{Operators Present} \times \text{Hours Worked} \times 60} \times 100$$
* Awards an automated visual badge:
* **Excellent**: $\ge 90\%$
* **Good**: $75\% - 89\%$
* **Below Target**: $< 75\%$
---
## Phase 12: Subcontracting & Job Work (Delivery Challans)
Manage external operations for knitting, dyeing, chest print, embroidery, or bio-washing.
* **Menu Path**: `Garment ERP > Subcontracting / Job Work > Job Work Challans (DC)`
### Step-by-Step Procedure:
1. Click **New** and enter:
* **Job Worker / Subcontractor** partner.
* **Processing Operation**: Knitting, Dyeing, All-Over Print, Chest Print, Embroidery, Washing, Finishing.
* **Rate Basis** (Per Kg / Per Piece) and **Job Work Rate (INR)**.
* **Standard Process Loss %**: Allowed shrinkage/wastage during process (e.g., `4.0%`).
* Transport details: Vehicle Registration No, GST E-Way Bill Number, Expected Inward Date.
2. **Materials Sent Outward Tab**:
* Add fabric rolls or garment bundles with dispatched quantities.
* Click **Dispatch Material (Outward DC)** $\rightarrow$ Status changes to `Material Sent`.
* Print the official GST **Job Work Delivery Challan (DC)** report.
3. **Materials Inward Received Tab**:
* As processed goods return, record Date, Vendor DC No, Received Qty, and Rejected Qty.
* The system calculates **Accepted Good Qty**, **Pending Balance Qty**, **Actual Process Loss %**, and **Total Job Work Cost**.
4. Click **Complete Job Work** once all materials are returned.
---
## Phase 13: Multi-Stage Quality Control (QC) & Rework Routing
Inspect garments at key control gates and route defects for alteration.
* **Menu Path**: `Garment ERP > Quality & Rework > Quality Inspections (QC)`
### Step-by-Step Procedure:
1. Click **New** and choose the **Inspection Stage**:
* `Fabric Inspection`
* `Cutting Section QC`
* `Sewing Inline Roaming QC`
* `Sewing Endline 100% Checking`
* `Job Work Inward QC`
* `Final AQL 2.5 Pre-Shipment Audit`
2. Select Production Plan, Garment Style, Color, Size, Bundle Ref, and Sewing Line.
3. Enter **Lot Quantity**, **Sample Quantity Checked**, **Passed Quantity**, and **Failed Quantity**.
4. Under **Defect Details**, log identified flaws from the Defect Master (e.g., Broken Stitch, Skipped Stitch, Oil Spot, Needle Hole, Measurement Variance).
5. **Inspection Verdict**:
* **Pass**: Click **Pass Inspection** $\rightarrow$ Status updates to `Quality Approved`.
* **Rework**: Click **Trigger Rework Order**:
* Creates a linked `garment.rework.order` record.
* Verdict sets to `Rework Required`.
6. **Rework Order Execution** (`Quality & Rework > Rework Orders`):
* Responsible section assigned: Sewing alteration, Cutting panel replacement, Spot cleaning, or Job worker re-processing.
* Workflow stages: `Assigned` $\rightarrow$ `In Rework` $\rightarrow$ `Ready for QA Re-check` $\rightarrow$ `Passed QA Re-check` (restores pieces to production) or `Irreparable / Scrapped`.
---
## Phase 14: Master Carton Packing, Finished Goods (FG) & Dispatch
Pack garments into shipping cartons, update finished goods inventory, and dispatch.
### Part A: Carton Packing Plan
* **Menu Path**: `Garment ERP > Packing & Dispatch > Packing Plans`
1. Click **New**, select **Production Plan**, **Garment Style**, and **Carton Packing Method**:
* `Solid Color / Solid Size` (Single SKU per carton).
* `Solid Color / Assorted Size` (Ratio pack, e.g., 1S:2M:2L:1XL).
* `Assorted Color / Assorted Size` (Pre-pack mix).
2. Under **Master Cartons**, add cartons:
* Enter box dimensions: Length (cm), Width (cm), Height (cm). The system computes **CBM ($m^3$)**:
$$\text{CBM} = \frac{\text{Length} \times \text{Width} \times \text{Height}}{1,000,000}$$
* Enter Net Weight & Gross Weight.
* Under **Carton Breakdown**, enter the color and size pieces packed in each box.
3. Click **Transfer to Finished Goods**:
* Updates **Finished Goods Inventory** (`garment.finished.goods`) by variant SKU with on-hand quantities. Status updates to `Packed & Transferred to FG`.
### Part B: Dispatch & Shipping Logistics
* **Menu Path**: `Garment ERP > Packing & Dispatch > Dispatch & Shipments`
1. Click **New**, select **Buyer / Consignee**, **Sales Order**, and **Production Plan**.
2. Enter logistics info: Carrier / Shipping Line, B/L or Air Waybill No, Container No, Customs Seal No, Truck No, Port of Loading, and Port of Discharge.
3. In **Dispatched Cartons**, select all cartons loaded into the container or truck.
* Total cartons, total garments, total gross weight, and total shipment CBM are computed automatically.
4. Click **Dispatch Shipment**:
* Deducts shipped quantities from Finished Goods inventory and marks the shipment as `In Transit`.
5. Click **Mark Delivered** upon destination arrival.
---
## Control Room: Factory Dashboard & Traceability Explorer
### Factory Live Dashboard
* **Menu Path**: `Garment ERP > Dashboards > Factory Live Dashboard`
Monitors real-time shop floor performance across 4 operational domains:
* **Executive KPIs**: Active Garment Orders, Total Booked Pieces, Active Production Plans, Average Production Progress %.
* **Sewing Floor Efficiency**: Active Sewing Lines, Today's Output Target vs Actual, Average Line Efficiency %, Today's Alteration Count.
* **Inventory & Materials**: Fabric Stock (Kg), QC Approved Rolls, Finished Goods Stock (Pcs).
* **Operations & Subcontracting**: Pending Job Work Challans, Open Rework Orders, Cartons Ready for Dispatch.
### End-to-End Traceability Explorer
* **Menu Path**: `Garment ERP > Dashboards > Traceability Explorer`
Enter any tracking number (Buyer PO, Production Plan #, Roll Barcode, Bundle QR, or Carton #) to view complete forward and backward traceability:
$$\text{Buyer PO} \longrightarrow \text{Production Plan} \longrightarrow \text{Fabric Rolls} \longrightarrow \text{Cutting Orders} \longrightarrow \text{Bundles} \longrightarrow \text{Sewing Logs} \longrightarrow \text{QC Inspections} \longrightarrow \text{Cartons} \longrightarrow \text{Dispatch}$$
---
## Index of Standard Print Reports & Barcode Tickets
All reports are available via the standard **Print** menu on their respective documents:
| Document / Report | Technical Report ID | Primary Model | Contents |
| :--- | :--- | :--- | :--- |
| **Sales Order Matrix Report** | `report_garment_sales_matrix` | `sale.order` | Buyer PO, Style specs, 2D Color × Size grid, delivery terms. |
| **Production Master Plan** | `report_garment_production_plan` | `garment.production.plan` | Target quantities, style BOM reference, scheduled dates. |
| **Bundle Barcode Tickets** | `report_garment_bundle_barcode` | `garment.bundle` | Printable QR/Barcoded ply bundle stickers for floor tracking. |
| **4-Point Fabric Inspection** | `report_garment_fabric_inspection` | `garment.fabric.inspection` | Defect point scoring sheet and roll approval certificate. |
| **Cutting Lay Plan & Marker** | `report_garment_cutting_plan` | `garment.cutting.plan` | Marker length, ply count, size cut ratio, and roll allocation. |
| **Job Work Delivery Challan** | `report_garment_jobwork_challan` | `garment.jobwork.order` | GST-compliant outward delivery challan (DC) for subcontractors. |
| **Quality Inspection Report** | `report_garment_quality_inspection` | `garment.quality.inspection` | Stage defect breakdown, sample size, and rework instructions. |
| **Export Packing List** | `report_garment_packing_list` | `garment.packing.plan` | Box-by-box breakdown, CBM, weights, and shipping marks. |
| **Garment Costing Sheet** | `report_garment_costing` | `garment.costing` | Pre/Post costing analysis with component-wise margins. |
---
*© 2026 Chennora Technologies / Tiruppur Garment Manufacturing ERP Suite for Odoo 19.*