* feat(rank-tracking): raise scheduler budget to 2000 units/tick
The 200-unit budget used ~2-6% of DataForSEO's 2,000 req/min account
cap and would take days to drain the post-#462 backlog. Scheduled checks
run through the task queue (1 task_post per 100 units + free task_get
polls), so a full 2,000-unit tick peaks around 1,200 req/min — still
leaving headroom for the other DataForSEO products on the account.
Also raise the due-config fetch limit to 500 so skip-heavy stretches
(free orgs, keywordless configs) drain more than 200 rows per tick.
* fix(rank-tracking): retune budget to 1000 with accurate sizing and a tick deadline
Review corrections to the 10x bump: task_get polling is one call per unit
per round and rounds wake synchronized per tick, with up to three ~15-min
poll windows overlapping the */5 cron — 2000 units/tick could saturate
DataForSEO's 2000 req/min cap, silently aging throttled polls into the
~3x-cost live fallback billed to customers. 1000/tick keeps real headroom
and is still ~45x steady-state demand.
Add a 3-minute wall-clock deadline to the per-config loop (stoppedByDeadline
in the tick summary): a skip-heavy 500-candidate tick pays serial Autumn
round-trips per distinct org and could otherwise run into the 15-minute cron
kill. Name the fetch limit (DUE_CONFIGS_PER_TICK) and correct its comment.
Test fixtures now derive from MAX_KEYWORDS_PER_CONFIG instead of asserting
an unreachable 1500-keyword config.
* fix(cron): run the audit watchdog before the rank loop
reconcileStaleAudits ran after runScheduledRankChecks in the same
invocation, so a slow rank tick would delay the watchdog and a wall-clock
kill would skip it entirely.
* fix(cron): preserve watchdog failure signal; codex review polish
Rethrow a caught reconcileStaleAudits error after the rank loop so the
invocation still reports failed (matching pre-reorder semantics), use an
inclusive deadline comparison, and note overlapping-tick poll residue in
the sizing comment.
Project deletion cascaded through saved keywords, rank tracking, and
audits, and the endpoint had no role check (Codex security finding).
Instead of gating a destructive delete, remove it: archiving stamps
archived_at, hides the project everywhere (lists, project context,
rank-check cron), and preserves all data. Archived projects can be
restored from the Manage projects page.
The restore input is named archivedProjectId because the global
ensureUserMiddleware resolves any projectId in input data against
active projects and would 404 before the handler runs.